Enterprise Architecture Archives ~ fitzmoskal https://fitzmoskal.me/category/skills/leadership-skills/enterprise-architecture/ You are _here_ Thu, 29 Feb 2024 16:56:36 +0000 en-GB hourly 1 https://wordpress.org/?v=6.9.4 https://fitzmoskal.me/wp-content/uploads/2024/02/cropped-result_880649-32x32.jpeg Enterprise Architecture Archives ~ fitzmoskal https://fitzmoskal.me/category/skills/leadership-skills/enterprise-architecture/ 32 32 11678478 German Car Systems Maker – Storage Integration https://fitzmoskal.me/german-car-systems-maker-storage-integration/ Mon, 26 Feb 2024 16:31:21 +0000 https://fitzmoskal.me/?p=1468 I worked with this German company to enhance their Discovery and CMDB with various storage metadata and data from unsupported

The post German Car Systems Maker – Storage Integration appeared first on fitzmoskal.

]]>

I worked with this German company to enhance their Discovery and CMDB with various storage metadata and data from unsupported storage systems. I wrote extensive TPL code which integrated with APIs for NetApp, Dell Isilon, IBM Spetrum, and Nasuni.

For Nasuni I had to develop the whole model using data extracted from the APIs to model the Management Console, Volumes and Shares.

The outcome of this project was to allow the client to accurately track storage usage and billing.

During this time I also assisted the client in troubleshooting Azure discovery and retrieving additional matadata from VMware.

The post German Car Systems Maker – Storage Integration appeared first on fitzmoskal.

]]>
1468
UK Non-Profit Organisation – SaaS Solution https://fitzmoskal.me/uk-non-profit-organisation-saas-solution/ Mon, 26 Feb 2024 16:03:39 +0000 https://fitzmoskal.me/?p=1465 I was technical lead on a project worth $40k to implement the Helix Discovery SaaS solution. Since scanning hybrid infrastructure

The post UK Non-Profit Organisation – SaaS Solution appeared first on fitzmoskal.

]]>

I was technical lead on a project worth $40k to implement the Helix Discovery SaaS solution. Since scanning hybrid infrastructure requires on-prem components there was still substantial Solution Design work required.

At this time the SaaS product was less than 18 months old and there were gaps in features and functionality in how it worked compared to the on-prem version. This led to challenges with unkown behaviour and bugs in the collector/outpost components which had to be resolved whilst maintaining client confidence in the solution they had bought.

An example challenge was in deploying shared outposts (documented as supported) between prod and dev SaaS instances. During deployment, an update was made to prod which delivered a change in key management to the outpost, and caused it to stop communicating with dev. The issue was resolved a week later when dev was updated, however it did mean that future architecture had to be updated to avoid this type of issue. Thankfully it did not impact delivery of the project.

The customer was also given value added data quality reporting allowing them to identify various gaps and misconfiguration across their estate.

The post UK Non-Profit Organisation – SaaS Solution appeared first on fitzmoskal.

]]>
1465
UK Telecoms Company – Digital Transformation https://fitzmoskal.me/uk-telecoms-company-digital-transformation/ Mon, 26 Feb 2024 15:45:35 +0000 https://fitzmoskal.me/?p=1462 As part of a larger digital transformation I was responsible for the architecture of their Discovery, modelling application architecture and

The post UK Telecoms Company – Digital Transformation appeared first on fitzmoskal.

]]>

As part of a larger digital transformation I was responsible for the architecture of their Discovery, modelling application architecture and data integration pipelines to the CMDB.

The initial deployment was minimal and did not cover the whole estate, which was airgapped. I was challenged to come up with an architecture which would be suitable enough capture data across the airgapped environments. The proposed solution involved manual DB snapshots which would be transferred by ftp, however this was later dropped in favour of deployment of a mutual shared platform, which was desperately needed.

This was a part-time multi-year engagement, during this time I developed and delivered various customatisations to their data collection and pipeline, such as:

  • SSL Certificate Discovery
  • Netcool edge device intergration
  • Service modelling
  • Reporting and analytics
  • Written maintenance manual

The post UK Telecoms Company – Digital Transformation appeared first on fitzmoskal.

]]>
1462
UK Retailer – Managed Service Architecture https://fitzmoskal.me/uk-retailer-managed-service-architecture/ Mon, 26 Feb 2024 15:29:31 +0000 https://fitzmoskal.me/?p=1459 I was responsible for the improving the managed service architecture of a multi-year service contract already in-flight. There had been

The post UK Retailer – Managed Service Architecture appeared first on fitzmoskal.

]]>

I was responsible for the improving the managed service architecture of a multi-year service contract already in-flight. There had been significant issues raised over the quality of the service up until my engagemement.

The main complaints were:

  • Support resource not seen to be solving any reported issues
  • Missing roadmap meetings
  • Not feeling the value

An action plan and strategy was put in place, for me to conduct quarterly service reviews where I would present the latest features of the products and recommend strategy for upgrade and utilisation of these features, including any enhancements we could provide to the service.

The support resource issue was identified as being a follow on outcome of the customer not willing to log tickets and instead engaging the named resource directly. In this way the resource was being treated as a contractor and being asked to work on various unspecified tasks and issues. In discussing the issue with the client, I suggested they could either continue with no SLAs and agree to the support resource under 1-day per week effort, or that in order for us to track performance and ensure requests were deailt with, they would need to engage with the service and log tickets.

However, as many of the requests would have been out of the scope of the service and meant engagement with professional services, they did not want to implement this change. They prefered to carry on under the existing arrangement, without further complaint.

During this time I was also able to implement health checks for them and identify a number of security vulnerabilites which were esclated to their CISO. One was the identification of plaintext username/password strings in running processes, and the other was production level software running under a non-service account credential.

The post UK Retailer – Managed Service Architecture appeared first on fitzmoskal.

]]>
1459
US Vehicle Manufacturer – Managed Service https://fitzmoskal.me/us-vehicle-manufacturer-managed-service/ Sat, 24 Feb 2024 02:54:49 +0000 https://fitzmoskal.me/?p=1452 I was contracted to help win a bid for providing a managed service worth $200k to a large US-based vehicle

The post US Vehicle Manufacturer – Managed Service appeared first on fitzmoskal.

]]>

I was contracted to help win a bid for providing a managed service worth $200k to a large US-based vehicle manufacturer. They were intially discussing a multi-year deal for plant inventory discovery, however it was quickly realised by the client that it would make sense to turn this into a managed service.

The service included upgrade of current Discovery solution with right-sizing the architecture, installation of Remedy with CMDB and support services. The scope of Discovery was to scan the plant networks – the challenge being that these were on profinet and were not only sensitive equipment but scanning was only permitted under very strict windows.

We managed to complete the implementation of the solution upgrade and installation, with the implementation of the full managed service coming later due to delays on the client end. As part of value add of the service, the customer was also provided with a custom solution I developed in python that worked with the Discovery API to be able to load IP ranges with updated location information and automatically update the scan data and schedules.

The post US Vehicle Manufacturer – Managed Service appeared first on fitzmoskal.

]]>
1452
US Insurance Firm – Cloud Migration https://fitzmoskal.me/us-insurance-firm-cloud-migration/ Sat, 24 Feb 2024 02:31:33 +0000 https://fitzmoskal.me/?p=1449 I was the technical lead on a project worth $170k to migrate the on-premise Discovery solution to to Helix Discovery

The post US Insurance Firm – Cloud Migration appeared first on fitzmoskal.

]]>

I was the technical lead on a project worth $170k to migrate the on-premise Discovery solution to to Helix Discovery SaaS.

This was a significant project as it was the first migration I had been asked to architect, so I had no templates or documentation to work off. I created the SOW, Solution Design and Project Plans. I decided that the best approach was to conduct a gap analysis and then work out what needed to achieved from there. As I had already worked several project with the SaaS platform, I was not totally in the dark.

The SaaS migration in some was would be technically easy because it was about determining what functionality would be decomissioned as it was not avialable in the cloud. However this needed to be carefully navigated with the stakeholders to reassure them that the functionality was either not needed for the SaaS platform, or there would be an alternative method/workaround for them to achieve the same results they got from the on-premise solution.

One of the interesting things turned up from the gap analysis was that they were under-licensed. As well as my company as a partner company being affected, we had a fiscal duty to report this back to the vendor. This did trigger a discussion with the client which was not initially well-recieved.

After many discussioned had taken place at the c-level I was asked for technical input as to whether there was a way they could be brought back into compliance. Fortunately, I did have an inelligant workaround solution which required a slightly more hands on approach to managing the scanning schedules and data collection. It did however provide satisfaction of the client and vendor, allowing the migration to continue successfully.

The post US Insurance Firm – Cloud Migration appeared first on fitzmoskal.

]]>
1449
US Steel Manufacturer – ITAM & AIOps https://fitzmoskal.me/us-steel-manufacturer-itam-solution/ Sat, 24 Feb 2024 02:15:15 +0000 https://fitzmoskal.me/?p=1446 ITAM Solution I was technical lead on a project worth $200k to implement the Helix Discovery SaaS solution. Since scanning

The post US Steel Manufacturer – ITAM & AIOps appeared first on fitzmoskal.

]]>
ITAM Solution

I was technical lead on a project worth $200k to implement the Helix Discovery SaaS solution. Since scanning hybrid infrastructure requires on-prem components there was still substantial Solution Design work required.

At this time the SaaS product was less than 18 months old and there were gaps in features and functionality in how it worked compared to the on-prem version.

This led to challenges with unkown behaviour and bugs in the collector/outpost components which had to be resolved whilst maintaining client confidence in the solution they had bought. All bugs were logged and tracked with the vendor, but thankfully sufficiently minor that they did not delay implementation of the solution.

The customer was also given value added data quality reporting allowing them to identify various gaps and misconfiguration across their estate.

AI Led Operational Improvements

I worked in presales to present insights into their ITSM operations gathered from Talos back to the client. My involvement was in data cleansing and preparation for injesting into Talos for supervised and unsupervised learning. Once Talos had created the reports, I would then import these to PowerBI to develop the insights. With AI we were able to identify:

  • Issue candidates for automation e.g. “password reset”
  • Categorical data located in unstructured notes fields
  • Under-utilisation of knowledge and overuse of top 5 knowledge articles suggesting need to break down into multiple topics
  • Poor knowledge tagging to incident correlation, impacting the performance of the chatbot
  • High MTTR for self-service leading to higher phone-resolved issues with shorter MTTR
  • Discovery of sensitive (GDPR) information in unstructured text fields

This was followed up with an offer to the client to deliver the recommendations such as service desk training, restructuring categories, data cleansing, and knowledgebase improvements.

The post US Steel Manufacturer – ITAM & AIOps appeared first on fitzmoskal.

]]>
1446
Telecoms Company – Digital Transformation https://fitzmoskal.me/telecoms-company-digital-transformation/ Sat, 24 Feb 2024 01:59:07 +0000 https://fitzmoskal.me/?p=1443 My company was initially approached directly by this large telecoms company to deploy Discovery with CMDB. My role as the

The post Telecoms Company – Digital Transformation appeared first on fitzmoskal.

]]>

My company was initially approached directly by this large telecoms company to deploy Discovery with CMDB. My role as the Principal was technical lead for the project and Solution Architecture. Having worked with the client to draw up the Solution Design, they dropped the project after the first milestone, and used my Solution Design to deploy it themselves.

We were then approached approximately 12 months later by a large managed services company that had taken on the client and wanted to outsource to our Asset & Configuration service solution since they did not have the technical expertise. An intial gap analysis revealed they had mostly followed the design but were struggling in some key areas.

I worked with the MS provider to (now our customer) to workshop and architect the service, worth £240k, that we would provide which included the following roadmap:

  • Extend the current deployment and resolve gaps in estate scanning
  • Integrate with with Rapid7 to enhance CMDB with ownership details
  • Data Quality Assurance
  • Deployment of uControl for service modelling
  • Credential and license management analysis
  • Initiative to identify application owners to reduce risk and improve efficiency in reporting

The post Telecoms Company – Digital Transformation appeared first on fitzmoskal.

]]>
1443
Canadian Investment Asset Management Company – Ditigal Transformation https://fitzmoskal.me/canadian-investment-asset-management-company-ditigal-transformation/ Thu, 22 Feb 2024 14:37:17 +0000 https://fitzmoskal.me/?p=1426 I was part of a consultancy team to deploy a new ITAM function and I was specifically responsible for discovery

The post Canadian Investment Asset Management Company – Ditigal Transformation appeared first on fitzmoskal.

]]>

I was part of a consultancy team to deploy a new ITAM function and I was specifically responsible for discovery and integrations to the CMDB, a project worth $3m over 3 years.

The particular challenges faced were that all of their IT functionalities were outsourced to different partners and vendors and some of these partners insisted on work orders to help us with data gathering. This was a complex challenge which required some level of obtaining buy-in and negotiating with the client to get work orders processed as quickly as possible to meet our tight deadline.

I held multiple workshops with the client and partners – and we deployed a “waterfall” data pipeline for populating the CMDB.

After deployment was completed, an issue arose with the accuracy of the CMDB and the wording of the contract which was “95%” accuracy, with no caveats. The first milestone payment was held back whilst the team resolved this critical issue.

I was not directly involved with the client by this time, but as part of resolution I suggested to the account management team that they needed to ensure the contract wording was updated in future to specific automated data only. I also assisted with identifying the sources of data, and types of data – such as that which would be manually entered and would ultimately be down to the client to ensure it met “95%” quality.

The final approach with the client was to review all CIs and fields within the CMDB to be populated and adopt a MoSCoW approach, determining which data were neccesary and which data they agreed, for example, would be impossible to obtain. This massively improved the baseline results and showed that CMDB population was already very close to “95%”. After some additional work on the data pipeline the customer agreed to release the first payment milestone.

The post Canadian Investment Asset Management Company – Ditigal Transformation appeared first on fitzmoskal.

]]>
1426
Public Utility Company – Digital Transformation https://fitzmoskal.me/public-utility-company-digital-transformation/ Thu, 22 Feb 2024 14:06:55 +0000 https://fitzmoskal.me/?p=1423 ITAM Solution As part of my time as a Delivery Manager I worked with an account to deploy an IT

The post Public Utility Company – Digital Transformation appeared first on fitzmoskal.

]]>
ITAM Solution
This image has an empty alt attribute; its file name is DALL%C2%B7E-2024-02-22-14.05.12-An-industrial-water-treatment-plant-exterior-during-daytime.-The-scene-includes-large-metal-water-storage-tanks-a-network-of-pipes-connecting-the-ta-1024x585.webp

As part of my time as a Delivery Manager I worked with an account to deploy an IT Asset Management solution as part of a Global Programme, and to fill in as Test Manager for the new Workday HR system.

The account management team for this company had been selected interally, and did not have a choice about taking the solution so there was a lot of resistance, particularly using security as a blocker. This was overcome by a global CISO sign off, however I listened to the concerns of the account that the licensing would take them over their budget and knew there was a better way to create a Win-Win scenario for them and for us.

I advised the Programme Manager that we needed to not only deploy the ITAM solution but create a package of benefits for them – which required setting up some reporting an analytics. I asked the account director to provide a breakdown of their charges for services and an export of their current asset data.

With this information, using Discovery, I was able to identify that they were underbilling by £50k annually, primarily on database services to their client. Another highlight was to replace their manual spreadsheet tracking of software with the product’s up to date OOTB software lifecycle reporting, allowing them to save time on querying manually and implement accurate, up to date record keeping.

HR Solution

I was asked to fill in as a Test Manager for a HR system rollout already in progress after the current test manager had left. The issues over resourcing meant that the delivery team had fallen behind and the deadline for implementation was at risk.

The key was to commit to being fully onsite, and obtaining buy in from the team to work extra hours to get catch up. I was in charge of ensuring that all the test scripts were completed, bugs were handled by the onsite developer, or exeptions were signed off.

With the combined effort of the team, we managed to pull the project back on track and able to deliver the implementation of the HR system to client satisfaction. Not all of the test scripts had been completed, but it was agreed with the client all significant bugs had been resolved and so the outstanding backlog were not critical to functionality and could be handed post go-live.

The post Public Utility Company – Digital Transformation appeared first on fitzmoskal.

]]>